7 Commits
Author SHA1 Message Date
FlamingLilyandGitHub 6a9101e763 Fixes SMES hacking (#19549)
~~In preparation for my grand political strategy to get SMES hacking
wires added to the aurora wiki, I made sure they were working.~~

It's on the wiki now so you have to merge this it's canon 🫡 

Changes:
* The RCON wire in a SMES now actually disconnects a SMES from RCON
(before it only prevented AI control).
* When the input wire is cut in a SMES, it will now correctly report
that the SMES is not charging on the UI.
* The Failsafe and Grounding wires of a SMES now correctly trigger the
red light when only one is cut, instead of both needing to be triggered.

---------

Signed-off-by: FlamingLily <80451102+FlamingLily@users.noreply.github.com>
2024-07-03 04:01:44 +00:00
23c0fd7b4f Autolathe and wires panel TGUI, autolathe queueing. (#17978)
* autolathe 1

* FUCK MY LIFE

* more fixes

* autolathe queueing

* cl

* garbage collection

* wire fixes

* some final tweaks

* on second thought this might be annoying

* fix that

* whoopsies

* that didn't work for shit

---------

Co-authored-by: Matt Atlas <liermattia@gmail.com>
2023-12-21 11:40:49 +00:00
dd482c63af Update the codebase to 515. (#15553)
* Update the codebase to 515.

* edit that

* WHOOPS

* maor

* maybe works

* libcall and shit

* do that too

* remove that

* auxtools isnt updated so get rid of it

* actually remove auxtools lol

Co-authored-by: Matt Atlas <liermattia@gmail.com>
2023-01-23 21:21:37 +01:00
LohikarandErki fb73735ceb Minor Performance Tweaks (#3265)
changes:

/datum/wires no longer has an (init) proc.
SMES wires now use timers instead of spawn.
Cleanables' random_icon_states list is now lazy. (eliminates ~4000 lists from dirt)
/obj/effect can no longer be pushed around by conveyor belts.
Lighting overlays are now explicitly prevented from being moved by conveyor belts.
2017-08-11 22:57:57 +03:00
Atlantiscze d761eaf38c I am an idiot.
- Replaces typo which caused SMES wire pulsing to be broken.
2014-12-08 06:27:11 +01:00
Atlantiscze 39229e4a1f Few updates to SMES wiring datum:
- Pulsing input/output wires now toggles the input/output settings, instead of disabling for 60s
- Pulsing grounding wire now disables grounding until the wire is cut and mended again.
2014-12-08 03:55:35 +01:00
Atlantiscze 994ad591e6 RCON System (v1.0)
- Allows remote control of SMES units and Breaker Boxes.
- Adds wires to SMES units. Wires may be cut/pulsed for various effects. Signallers are supported.
- RCON console(s) may be used to monitor the SMES units (which have RCON enabled) remotely, showing output loads and charge percentages.
- SMESs may be quickly discharged by cutting the grounding wire. This however comes with little risk of overload which may damage APCs on output powernet.
2014-12-08 03:30:20 +01:00