Files
Aurora.3/code/modules/power/terminal.dm

33 lines
852 B
Plaintext

// the underfloor wiring terminal for the APC
// autogenerated when an APC is placed
// all conduit connects go to this object instead of the APC
// using this solves the problem of having the APC in a wall yet also inside an area
/obj/machinery/power/terminal
name = "terminal"
icon_state = "term"
desc = "It's an underfloor wiring terminal for power equipment."
level = 1
layer = TURF_LAYER
var/obj/machinery/power/master = null
anchored = 1
layer = 2.6 // a bit above wires
/obj/machinery/power/terminal/Initialize()
. = ..()
var/turf/T = src.loc
if(level == 1)
hide(!T.is_plating())
return
/obj/machinery/power/terminal/Destroy()
if(master)
master.disconnect_terminal()
master = null
return ..()
/obj/machinery/power/terminal/hide(var/i)
invisibility = i ? 101 : initial(invisibility)
icon_state = i ? "term-f" : "term"