Merge branch 'master' into upstream-merge-12595

This commit is contained in:
Nadyr
2022-04-04 16:50:32 -04:00
committed by GitHub
28 changed files with 64249 additions and 184 deletions
+1 -14
View File
@@ -484,33 +484,24 @@
</style>
</head>
<body>
Technical Order (TO) 1-33-34-2 <br>
<h1>Operator's Manual - Rotary Electric Generator, D-Type</h1><br><br>
Supporting Data: <br>
- TO 1-33-34-4-1 Illustrated Parts Breakdown - Rotary Electric Generator, D-Type <br>
- TO 1-33-34-6 Inspection Work Cards - Rotary Electric Generator, D-Type <br><br>
Support Equipment: <br>
- Torque Wrench, 100-80,000 inch-pounds <br>
- Composite Tool Kit, Standard <br>
- Multitool with Lead Kit, Wire Kit <br> <br>
Required Supplies: <br>
- stainless steel, 10,000cm3 <br>
- lubrication, petrolatum, 6000ml <br>
- electrical wiring, 5m <br>
- component set, capacitors (any grade) <br>
- circuitry board, REG <br> <br>
<h1>SETUP AND OPERATING PROCEDURES</h1> <br> <br>
Setup: <br> <br>
CAUTION: Do not remove too much air from the work space or personnel may be exposed to hypoxia or similar effects. <br> <br>
1. Prepare setup area. Remove machinery, debris, foreign objects, people, and extra air. <br> <br>
2. Lay out preliminary electrical wiring. <br>
@@ -534,9 +525,7 @@
9. Wait for assembly to finish inflating, and the unit is ready for service. <br> <br>
Operating Procedures: <br> <br>
NOTE: Operation of REG-D type generators requires significant physical effort. Ensure users are provided adequare nutrition and hydration throughout the working period. <br> <br>
1. Designate the individual who will be operating the REG-D. <br> <br>
@@ -552,9 +541,7 @@
5. Continue to run on the REG-D track body until sufficient energy is stored in systems or Operator is no longer able or willing to continue. <br> <br>
6. To end a session, carefully lower forward running speed until the track body comes to a complete stop, then disembark the REG-D. <br> <br>
REFER TO TO 1-33-34-6 FOR MAINTENANCE AND INSPECTION PROCEDURES
</body>
</html>
"}
"}