mirror of
https://github.com/CHOMPStation2/CHOMPStation2.git
synced 2025-12-10 10:12:45 +00:00
- Super APC installed in Atmos - Fixed APC, Mining Exterior APC - Fixed Crematorium button, Installed mass driver button. - Chapel hallway APC installed - Gateway plugged in, console installed - Elevator Console Installed, Bell Hop removed. - Hazard stripes should be fixed - Restored missing tiles (Hydro, Cafeteria Neutral, Asteroid exterior) (75% complete) - Kitchen button restored - Rec area bathroom lights restored - Meat is back on the menu, two fridges with meat in the kitchen - Unneeded wires in engineering maint removed. - Medical substation wires fixed. - Locker room maint APC installed - Chapel maint APC installed - Installed another light in robotics - APC central maint installed - Disposals pipe in engineering workshop fixed. - Wire in atmos substation fixed.