mirror of
https://github.com/CHOMPStation2/CHOMPStation2.git
synced 2025-12-13 03:33:21 +00:00
- Glass Sheets in robotics increased to two 50 sheet stacks. - Removed accidentally added tile next to medical. - Engineering Solar cameras now properly named and on proper networks. - Dock Hallway cameras added, Bridge entrance cameras updated with proper network. - Fixed broken access on Nanomed Plus vendors and medical closets. - Single fire extinguisher added to patient ward hallway - Work on the dock finalized, no other major changes to be done, glass firelocks installed. - Cafeteria work finalized. Glass firelocks added, Kitchen now properly access locked. - Air alarm added to security checkpoint. - Two emergency flood lights added to engineering storage. - Single camera added to EVA, may change out with two others. - Redundant and unnetworked cameras removed. - Hydroponics fore door switched to dual chef/gardener access. - Guess pass terminal added to the bridge hallway. - Bar layout finalized, glass firelocks added.