Commit Graph

10 Commits

Author SHA1 Message Date
PJB3005
257e77c400 /vg/ Multitool menu port!
With 100% better squashing.

I hope.
2015-05-14 22:34:02 +02:00
Markolie
956f2ba703 Event overhaul from Bay, atmos fixes 2015-01-21 23:05:59 +01:00
Markolie
f7ce7e55df Major atmos overhaul: scrubbers and pipes can now co-exist 2015-01-18 02:24:24 +01:00
Ravensdale
d01770ad56 Bringing in 4-way manifolds, pipe caps, manual tvalves. 2013-01-03 05:47:07 -08:00
giacomand@gmail.com
8273e419e2 Committing for Numbers.
* Fixed problems with Heat Exchanger facing
* Fixed massive problems with heat exchanger construction using the pipe dispensers

git-svn-id: http://tgstation13.googlecode.com/svn/trunk@4900 316c924e-a436-60f5-8080-3fe189b3f50e
2012-10-17 09:47:24 +00:00
giacomand@gmail.com
5557116fd9 Committing for Numbers.
- Readded Volume Pumps - now they work as intended and are constructable
- Readded Passive Gates - now they work as intended and are constructable
- Readded Heat Exchangers - now they work as intended and are constructable
- Added Heater - to warm up gasses to 300C
- Adjusted volumes on big tanks and portable pumps to 2000 and 1200 respectably
- Pipe dispensers can produce the readded pieces.
- Pipe construction code updated to compesate for the new items
- New graphics for all of the above - courtesy by Ausops.

git-svn-id: http://tgstation13.googlecode.com/svn/trunk@4785 316c924e-a436-60f5-8080-3fe189b3f50e
2012-09-30 19:31:35 +00:00
bbusse@gmail.com
90e0297389 Gas filters and mixers can be connected and wrenched around like any other pipe machinery, and new ones can be extruded from the pipe dispenser.
git-svn-id: http://tgstation13.googlecode.com/svn/trunk@2338 316c924e-a436-60f5-8080-3fe189b3f50e
2011-10-09 20:57:36 +00:00
rastaf.zero@gmail.com
6b7801c4af Singularity now wont leave floor under eaten walls.
Cryo wont spit out beaker.
Fixed message "You don't have the dexterity to do this" for machinery.
PIPES:
- Heat exchange pipes are constructable now.
- Insulated pipes also were added to pipe dispenser;
- And meters too;
- Easy pipe rotating in hands;
- bent pipes actually looks bent under construction (may be glitches, please report);
- pipes now wont cover wires;
- pipes unwrenching now possible;
- large vent pumps now uses power as equipment, not environment
- pumps now uses power;
Air alarm improvements:
- all alarms in area controls all environment machines in area;
- machines initializes itself automatically and without interloping with existing ones;
- air alarms wont duplicates it air monitoring and can clear itself;
Some other typos and small issues were fixed.


git-svn-id: http://tgstation13.googlecode.com/svn/trunk@816 316c924e-a436-60f5-8080-3fe189b3f50e
2011-01-08 22:16:27 +00:00
n3ophyt3@gmail.com
c38ba98498 More work on buildable piping
Manifolds, unary vents, scrubbers, manual valves, connectors, and pumps are now also makable
  testing has not been overly robust thus far
  Known issues:
    scrubbers don't seem to be able to grab nodes properly when constructed
    runtime errors if you try making a pipe/manifold that doesn't connect to an already-constructed atmos object
    corner pipe sections have a tendency to defy euclidian logic (most notable example has been a section of pipe that somehow had both ends tied to the same end of a different pipe section)
    Added a disposal pipe dispenser that had been sitting unused in the code to Atmos. No clue if it actually works, I know the regular pipe dispenser worked fine
    Did NOT add a pipe dispenser to the map, but it is there if admins want to spawn one

git-svn-id: http://tgstation13.googlecode.com/svn/trunk@396 316c924e-a436-60f5-8080-3fe189b3f50e
2010-11-10 05:24:56 +00:00
only.lurking
662c08272a git-svn-id: http://tgstation13.googlecode.com/svn/trunk@2 316c924e-a436-60f5-8080-3fe189b3f50e 2010-08-23 14:29:20 +00:00