From bcb6a6c756e62230d6e6452f2e525c852a776a74 Mon Sep 17 00:00:00 2001
From: klaasjared <86997650+GhostActual@users.noreply.github.com>
Date: Tue, 5 Apr 2022 16:40:37 -0400
Subject: [PATCH 1/2] Base Commit
---
code/game/objects/items/weapons/manuals_vr.dm | 329 +++++++++++++++++-
1 file changed, 312 insertions(+), 17 deletions(-)
diff --git a/code/game/objects/items/weapons/manuals_vr.dm b/code/game/objects/items/weapons/manuals_vr.dm
index 33087fb024..281e2a43d7 100644
--- a/code/game/objects/items/weapons/manuals_vr.dm
+++ b/code/game/objects/items/weapons/manuals_vr.dm
@@ -383,7 +383,7 @@
- lubrication, petrolatum, 6000ml
- electrical wiring, 5m
- component set, capacitors (any grade)
- - circuitry board, REG
+ - circuitry board, REG
SETUP AND OPERATING PROCEDURES
@@ -393,45 +393,45 @@
CAUTION: Do not remove too much air from the work space or personnel may be exposed to hypoxia or similar effects.
1. Prepare setup area. Remove machinery, debris, foreign objects, people, and extra air.
-
+
2. Lay out preliminary electrical wiring.
2a. Connect electrical wiring to existing facility power grid.
2b. Work wiring into shape as defined in TO 1-33-34-4-1 Figure 32 Index 6.
-
+
3. Prepare gathered steel supplies as defined in TO 1-33-34-4-1 Figure 2 Index 3.
-
+
4. Assemble prepared steel supplies into equipment framework by inserting rod A into slot B. Refer to TO 1-33-34-4-1 Figure 1 Index 1 for technical drawings.
4a. Secure assembled equipment framework to flooring by tightening lower frame bolts.
-
+
5. Install and secure circuitry board, REG-D into marked receptacle.
-
+
6. Install electrical wiring. Refer to TO 1-33-34-4-1 Figure 666 Index 6 thru Index 90 for routing.
-
+
7. Install capacitors into marked circuitry board slots. Do not force components into place, use even pressure. Do not use a hammer.
-
+
WARNING: Assembly will rapidly inflate when finalization is triggered. Ensure personnel and equipment are clear before initiating.
-
+
8. Finalize construction by turning the Initialize Finalization screw on the outer housing.
-
+
9. Wait for assembly to finish inflating, and the unit is ready for service.
-
+
Operating Procedures:
NOTE: Operation of REG-D type generators requires significant physical effort. Ensure users are provided adequare nutrition and hydration throughout the working period.
-
+
1. Designate the individual who will be operating the REG-D.
-
+
2. Provide a safety briefing regarding nutritional preparedness and physical ability.
-
+
NOTE: Stretching is highly recommended before and after any operation session.
3. Operator shall board the REG-D track body and ensure there are no unsecured objects on the path.
-
+
4. Once ready, Operator may begin running at own pace. Do not sprint. Maintain an even pace and proper running form for optimal energy generation.
-
+
5. Continue to run on the REG-D track body until sufficient energy is stored in systems or Operator is no longer able or willing to continue.
-
+
6. To end a session, carefully lower forward running speed until the track body comes to a complete stop, then disembark the REG-D.
@@ -439,3 +439,298 @@