mirror of
https://github.com/VOREStation/VOREStation.git
synced 2026-08-31 07:58:22 +01:00
- Yes, yes, I just had to do it... Rewired the new parts of the station so wire travels through as few walls as possible: - Wired the detective's office so the cable comes through the maintenance door - Wired the mail room so it receives power from the line from the south, so it doesn't have to go through the wall there, the same line now feeds the west bridge - Slight change to the new vacant office wiring so it doesn't come directly through the wall into the APC, as the south facing half-wire piece gets covered by the south facing terminal. It not comes into the room a tile to the right from before and makes a turn. git-svn-id: http://tgstation13.googlecode.com/svn/trunk@1549 316c924e-a436-60f5-8080-3fe189b3f50e