mirror of
https://github.com/yogstation13/Yogstation.git
synced 2025-02-26 09:04:50 +00:00
Wiring and APCs should work properly now. The SMES batteries are also properly connected to the power grid thanks to Muskets. Engine should stay contained. The crew cabins were made larger and reduced in number to a total of 8. The Prison shuttle now works thanks to Callagan. Robotics is now the man-cave once again. Virology airlock should be working and Med Bay features anesthetic as before. There are more comm radios around that station. Atmos is now color-coded on top of walls as requested in the forum. Beepsky should patrol normally now. Other fixes. Issues: Toilets will still likely lack air until they are properly coded. The crew cabins are not ID locked until they are coded. The brig does not feature a button for prisoners to leave until coded. Showers are missing until coded. git-svn-id: http://tgstation13.googlecode.com/svn/trunk@430 316c924e-a436-60f5-8080-3fe189b3f50e