* File creation, basic structure, cryo system, uninjured passenger room.
* Layout testing, temporary
* design flaw fixes
* Final Construction
* Code for shuttle to be pulled and purchased.
* Blood and IV drip, Toolbox for Preternis/IPC mending, Plasmaman Supply Locker (locked to medical general access)
* I promise I can count and totally didn't misalign the bottom airlocks to the station.
* Last touches I forgot after having to change to redo the doors.
* Totally not me changing the smallest little thing (light placement) to get the checks to run again.
* Moved the firedoors by the surgery beds so if there's a breach it won't block access from the correct side as the computers are facing up.
* Defibs mounted ha ha I am such a bad doctor.
* Change the interior brig corner to no-diag to avoid lights floating in mid-air.
* Testing showed cryo system doesn't like the giant O2 tank. A can that needs to be wrenched it is.