mirror of
https://github.com/yogstation13/Yogstation.git
synced 2025-02-26 09:04:50 +00:00
* File creation, basic structure, cryo system, uninjured passenger room. * Layout testing, temporary * design flaw fixes * Final Construction * Code for shuttle to be pulled and purchased. * Blood and IV drip, Toolbox for Preternis/IPC mending, Plasmaman Supply Locker (locked to medical general access) * I promise I can count and totally didn't misalign the bottom airlocks to the station. * Last touches I forgot after having to change to redo the doors. * Totally not me changing the smallest little thing (light placement) to get the checks to run again. * Moved the firedoors by the surgery beds so if there's a breach it won't block access from the correct side as the computers are facing up. * Defibs mounted ha ha I am such a bad doctor. * Change the interior brig corner to no-diag to avoid lights floating in mid-air. * Testing showed cryo system doesn't like the giant O2 tank. A can that needs to be wrenched it is.