[MDB IGNORE] Icebox piping and cabling lookover (#94367)

## About The Pull Request

Looks over all of Icebox, tweaking pipes and cables to remove
unnecessary extra pipes while still keeping them in line with standard
placement guidelines, as well as bringing some pipes/cables more in line
with standard placement even if it doesn't save on length. Nothing has
been moved but pipes and cables.

MDB ignore is because almost all of these changes are under floors, so
it'd be enormous pictures of three separate z levels with a grand total
of two changes visible.

Other than just efficient and standardized design, during this sweep a
few (actively) gameplay-effecting issues were resolved:

A prison air scrubber was placed on layer 4, and was thus disconnected.
A vent in left-side AI satellite maintenance was facing the wrong way,
and was thus disconnected.
A missing pipe to R&D server room caused its vent to be disconnected.
A missing set of pipes to Medbay Treatment Center's lower side caused
its lower vent and scrubber to be disconnected.
A lack of piping to Departures Secpoint caused its vent and scrubber to
be disconnected.


## Why It's Good For The Game

Nanotrasen will save tens, perhaps even hundreds of credits on station
construction, and will certainly transfer that saved money directly into
bonuses for their workforce. YOU might even get a raise!

Standardized and efficient design, without any drawbacks. Nothing has
been compromised for efficiency(aside from what was already compromised
prior to this pr. No further compromises were made on top of these
existing ones).

Solves the issues mentioned above

## Changelog
🆑

map: Several disconnected vents and scrubbers on Icebox have been
reconnected

/🆑
This commit is contained in:
Leland Kemble
2025-12-17 00:20:00 +00:00
committed by GitHub
parent c639186d9e
commit edea3dab20
File diff suppressed because it is too large Load Diff