mirror of
https://github.com/CHOMPStation2/CHOMPStation2.git
synced 2026-02-08 23:50:18 +00:00
Re-maped the R-UST to use proper Radiation shielded blast doors. Shifted R-UST control room down to allow exiting through the Engine SMES room. Removed magic snowflake glsss that blocks radiation and replaced it with normal borosilicate glass. Re-wrote part of the Engine setup guide to reflect the altered setup engine setup.