QM overhaul. Quartmaster office is now near the foyer area, along with necessary maintenance changes.

The shuttle dock has also been revamped and now resembles the original map.
Small change to CentCom because of this.
Toilet disposal system fixed.
A small change to EVA pipes.
Missing wires and pipes added to Hydro.

git-svn-id: http://tgstation13.googlecode.com/svn/trunk@503 316c924e-a436-60f5-8080-3fe189b3f50e
This commit is contained in:
noisomehollow@lycos.com
2010-11-28 21:35:08 +00:00
parent 12c53e514e
commit 2af0374e8f
+5925 -5923
View File
File diff suppressed because it is too large Load Diff