Connects the South Cable in the Boxstation Turbine to the Grid (#31006)

This commit is contained in:
Hayden Redacted
2025-11-16 11:53:09 +00:00
committed by GitHub
parent 082b5283ad
commit a451e92c1f
+2 -2
View File
@@ -77802,10 +77802,10 @@
},
/obj/effect/mapping_helpers/airlock/access/all/engineering/atmos,
/obj/effect/mapping_helpers/airlock/access/all/engineering/maintenance,
/obj/structure/cable/yellow{
/obj/machinery/door/firedoor,
/obj/structure/cable/extra_insulated/pre_connect{
icon_state = "4-8"
},
/obj/machinery/door/firedoor,
/turf/simulated/floor/plating,
/area/station/maintenance/turbine)
"tAE" = (